Professional installation of silica aerogel blankets on industrial pipelines at Nanjing Chemical Industrial Park

Application Guide: Aerogel Insulation Blankets & Aerogel Coatings

  I. Construction Method Statement: Aerogel Systems (Thin-Plaster & Integrated) In exterior wall applications, Aerogel blankets are typically integrated as high-performance core materials within a system rather than being exposed. Substrate Preparation Flatness Control: The substrate deviation must be maintained within ±3 mm. Action: Thoroughly remove floating dust and apply a specialized interfacial agent (primer) to enhance bonding strength. Aerogel Blanket

Read More »
Mars International India factory construction site - Steel structure plant installing RS insulated sandwich panel systems

ขั้นตอนการติดตั้งแผ่นฉนวนและตกแต่งแบบบูรณาการ

  I.Substrate Preparation & Surveying Substrate Requirements: The wall surface must be flat, dry, and free of oil stains. If the flatness deviation exceeds 4 mm, a leveling mortar coat is required. Surveying & Setting Out: Based on the architectural drawings, mark horizontal and vertical control lines on the wall to determine the precise installation position for each individual panel.

Read More »
Applying adhesive mortar to EPS board using the dab and dot bonding method for ETICS installation

วิธีการเชื่อมต่อแบบแถบและจุดมาตรฐานสำหรับ ETICS/EIFS

I. Adhesive Distribution & Layout For standard-sized insulation boards , the distribution rules are as follows:The Peripheral Ribbon (Frame): Apply a continuous strip of bonding mortar around the entire perimeter of the insulation board. The width should typically be , with a thickness of approx. .Central Dabs (Points): Distribute bonding points evenly across the center of the board. For standard boards,